+86-576-87477851 whf@zjhfhb.com 400-100-7669 English 中文版
废气净化塔
废气净化塔
废气净化塔
   ABOUT US
  CONTACT US  
  • Address: Xiqingtang complex building, Yuhuan, China
  • Tel:+86-576-87477851
    Fax:+86-576-87477851
  • E-MAIL:whf@zjhfhb.com
News Details
Do you know the precautions of the exhaust gas purification equipment

Now, with the development of industry, more and more factories are being built in our lives. It has promoted the development of our life, but the waste gas generated also brings great threat to our environment. Therefore, we need to deal with the waste gas well, which is inseparable from the exhaust gas purification equipment. Then note hoffen analysis of exhaust gas purification equipment exhaust gas purification tower?

1, before use, check whether the valves of each system are intact, whether the selection and proportioning of the absorption liquid are correct or not, and when the absorption liquid fails to meet the specified requirements, they need to be replenished in time. The pump should open the pump for 3 - 5 minutes and then open the fan. When we shut down the purification system, we should turn off the fan for 2 to 3 minutes before closing the pump. It can't be disorderly opened. Otherwise, it will burn the motor and block the packing, which will affect the purification effect.

2, the connection between blower and water pump of waste gas treatment and purification should not be arbitrary. It is absolutely necessary to ensure that their steering is correct and not reversed, otherwise it will damage motor and cause accidents.

3, after the operation of the exhaust gas purification equipment is delivered, the user shall send someone to keep it for use, check regularly, and find that the equipment is abnormal or noisy, and it should be stopped for repair before it can be used.

4, the exhaust gas purification equipment is installed in the outdoor, the pump fan motor should make rain proof cover so as to prevent the motor from dampness. No matter whether indoor or outdoor, for example, FRP or plastic fan, we must install protective cover to prevent screws from loosening, bearing damage or absorbing debris, and blow up when impeller is damaged, causing injuries.

5, the replacement and application of exhaust purification fluid: the ratio of purification and absorption liquid is determined according to the different gas sources and concentration of user units. After the commissioning of the equipment is normal, the user management personnel will be provided.

Hongfeng waste gas purification tower summarizes the above matters needing attention in exhaust gas purification equipment. I hope you can do well when using exhaust purification equipment.

 
>> Return to the previous one